Bridge Pavement Slabs Replaced With Tarmac as Temporary Measure
Residents reported a cracked line of flagstones on Henley Bridge on 8 July (4 weeks ago) and signs were installed saying the footpath was closed.
No work has taken place until this Sunday when a strip of the pavement has now been tarmaced.
A spokesperson for Henley Town Council said, “Our colleagues at Oxfordshire County Council (OCC) Highways (who are responsible for the pavement) have removed the slabs and replaced them with tarmac as a short-term safety measure in advance of Regatta. The bridge is often crowded with spectators and visitors during Regatta week. OCC will replace the tarmac with slabs as soon as they become available.”
Not a great look for visitors to our town for Regatta.




